You can configure the Cortex XDR Collector upgrade scheduler and the number of parallel upgrades.
Notice
Requires the Data Collection add-on.
You can configure the Cortex XDR Collector upgrade scheduler and the number of parallel upgrades. There can be a maximum of 500 parallel upgrades scheduled in a week, which is the default configuration at any time of day.
To define the XDR Collector upgrade scheduler and number of parallel upgrades.
In Cortex Cloud, select → → → .
Set the XDR Collectors Configurations settings.
Amount of Parallel Upgrades: Specify the number of parallel upgrades, where the maximum number is 500 (default).Days in Week: Select the specific days in the week that you want the upgrade to occur, where the default is configured as every day in the week.Schedule: Select whether you want the upgrade to be at Any time (default) or at a Specific time. When setting a specific time, you can set the From and To times.
Click Save.